Figure C

Instructions for guying out your tent using Line-Lokcord cleats. Use cord 2 – 5 mm in diameter.

1.Feed cord through cord cleat and secure as per Figure A below. When complete, assembly will appear as in Figure B.

Figure A

Figure B

2.To tension the cord, slide the cleat

towards the tent (Figure C).

to tent

to anchor

3.To release tension, pull the cords

apart (Figure D).

Figure D

Use your internal guy system for extreme weather conditions and high winds. The internal guy system consists of pieces of cord (96” long) and cord cleats (Figure 11). As the wind increas- es, increase the tension by tightening the cord cleats.

Figure 11

Satellite - 8

Page 9
Image 9
Mountain Hardwear Satellite manual Figure a