2.Starting Line – laying instructions
be filled up

2.Starting Line – laying instructions

To maximize usage of full panels at the borders, it is recommended that you select the longest walls or the entrance wall as starting point.

Note: Properly selecting the starting line is important. It saves labor time and materials.

Other factors that may affect choice of the starting line include: door, ramp, entry wall, other long walls and so on.

General Office Example – (Drawing D605)

Use the longer wall as the primary starting wall. Starting from the corner, test sequence no. 1 and no. 2 UniPanels along both walls, connected by half-Connector. If extension is not

obstructed, move on to

 

sequence no. 3. Be aware that

 

any two walls might not be

 

perfectly perpendicular to each

D605

other. If the second wall is at an

angle less than 90° to the

 

primary starting wall, the first

 

UniPanel laid will need to be

 

strategically offset from both

 

walls to allow for extension of

 

UniPanels in both directions.

D605A

The resulting gaps to both

 

walls will then

with appropriate accessories. If the gaps are greater than 1/5”(5

mm) in width, Edge Rail should work well.

Lay out entire floor with complete UniPanels until the remaining walls cannot allow complete UniPanels up against them. Cutting or trimming pieces will be required for the remaining walls to finish the UniPanel matrix. There will also be removal of some panels that have been laid down to apply the ramping required at the entranceways. In figure D605A, note that in cases where doors swing inside the room their must be a 25 sq. ft. entrance area to maintain ADA compliancy. The actual ramping area can easily be added by removing one UniPanel in front of the door plus an additional half of a UniPanel to account for the length of the ramps.

2

Page 3
Image 3
Multi-Link AD-600, ConnectFloor manual Starting Line - laying instructions, General Office Example - Drawing D605, D605A

FAQ

What is the recommended starting point for laying the Multi-Link ConnectFloor AD-600?

It is recommended to select the longest walls or the entrance wall as the starting point to maximize the usage of full panels at the borders.

What should I be aware of when laying the UniPanels for Multi-Link ConnectFloor AD-600?

Be aware that any two walls might not be perfectly perpendicular to each other. If the second wall is at an angle less than 90 to the primary starting wall, the first UniPanel laid will need to be strategically offset from both walls to allow for extension of UniPanels in both directions.

How can I maintain ADA compliancy when laying the Multi-Link ConnectFloor AD-600?

In cases where doors swing inside the room, there must be a 25 sq.ft. entrance area to maintain ADA compliancy. The actual ramping area can easily be added by removing one UniPanel in front of the door plus an additional half of a UniPanel to account for the length of the ramps.