3.Installation

a.Apply Sound Attenuation Blanket. Spray adhesive, duct tape, or 3M adhesive tape may be used to hold down the sound blanket to the sub floor.

b.Old carpet or resilient floor to substitute Sound Attenuation Blanket: For retrofit installation over existing commercial rated low-pile carpet, carpet tile, PVC tile and sheet vinyl, step a and b may be omitted. Depending on the old floor covering, Sound Attenuation Blanket may also be skipped.

However, application over thick foam-backed or cut pile carpet is not recommended.

c.Starting along the wall with half-size Base Connector:

First, use a knife or snap on a straight edge to cut Base Connector into halves.

Position original perimeter side of half-Connectors

against the wall surface, allowing a uniformD608 +/- .08”(2 mm) offset. Along the starting line,

connect corner feet of the first row UniPanels. (Drawing D608)

d.Repeat installation with full size Base Connectors: Starting from the second row, use full Base Connectors to UniPanels consecutively. No tool is needed. Extension of the Connectors and UniPanels is simple and straightforward.

e.Cable Trench: Base Connectors connect UniPanels at their corner feet as shown, setting the panels apart by a standard 3.54”(9 CM) gap. This automatically allows for a two-way uniform-width 3.54”