7.If the engine has started, slowly return the choke lever (Figure 12 ) to the “OPEN” position. If the engine has not started repeat steps 1 through 5.
8.Before the generators is placed into operation, run the engine for
9.Place the idle control switch (Figure 16) in the "OFF" (down) position. This will allow the engine speed to run at speed about 3600 RPM's
Figure 16. Idle Control Switch (Off)
Placing the idle control switch in
the OFF position (Figure 16) allows
NOTE the engine to operate at a maximum speed of about 3600 RPM's. When the idle control switch is placed in the up position (ON) (Figure 17),
the generators will run at idle speed (2200 RPM's) until a load is applied, at that time the engine speed will increase to 3600 RPM's as long as the load is being applied. When the load is not in use, the engine speed will drop back to the idle mode after about 3 seconds.
2.Place the full power switch (Figure 19) in the 120V position (up).
Figure 19. Full Power Switch 120 V Position (Up)
When the full power switch is in the 120 V
NOTE position, the 240V
3.Read the voltmeter on the front panel of the generators (Figure 20) and verify that120 VAC is present at the 120V
Figure 17. Idle Control Switch (On)
60 Hz Operation
1. Place main circuit breaker (Figure 18) in the ON position.
Figure 20. 120 V and GFCI Receptacles
4.Place the full power switch (Figure 21) in the 240V position (down).
Figure 18. Main Circuit Breaker (ON) | Figure 21. Full Power Switch 240/120 V Position (Down) |
PAGE 26 —