Multiquip ga6HEB manual Inspection/Setup, General Inspection Prior to Operation Ground Power Tools

Models: ga6HB ga6HEB

1 86
Download 86 pages 4.66 Kb
Page 20
Image 20
INSPECTION/SETUP

INSPECTION/SETUP

General Inspection Prior to Operation Ground Power Tools

When using power tools or electrical equipment requiring AC power from the generator, make sure power tool cord has a ground pin or is double insulated as shown in Figure 8.

General Inspection Prior to Operation Ground Power Tools NOTICE

Double-insulated power tools and small appliances have specially insulated housings that eliminate the need for a ground pin.These types of double-insulated power cords are designed so that no part of the device will be electrically live even if the internal insulation fails.

Extension Cable

When electric power is to be provided to various tools or loads at some distance from the generator, extension cords are normally used. Cables should be sized to allow for distance in length and amperage so that the voltage drop between the generator and point of use (load) is held to a minimum. Use the cable selection chart (Table 4) as a guide for selecting proper cable size.

DANGER

NEVER use power tools or equipment that do not have a ground capability, the possibility exists of electrocution, electrical shock or burn, which can cause severe bodily harm or even DEATH!

Figure 8. Ground Pin

Table 4. Cable Selection (60 Hz, Single Phase Operation)

Current In

Load In Watts

 

Maximum Allowable Cable Length

 

Amperes
120 Volts
240 Volts

#10 Wire

 

#12 Wire

#14 Wire

#16 Wire

2.5

300

600

1000 ft.

 

600 ft.

375 ft.

250 ft.

5

600

1200

500 ft.

 

300 ft.

200 ft.

125 ft.

7.5

900

1800

350 ft.

 

200 ft.

125 ft.

100 ft.

10

1200

2400

250 ft.

 

150 ft.

100 ft.

 

15

1800

3600

150 ft.

 

100 ft.

65 ft.

 

20

2400

4800

125 ft.

 

75 ft.

50 ft.

 

CAUTION: Equipment damage can result from low voltage.

page 20 — GA6HB/GA6HEB 60 hz gENERATOR• operation and parts manual — rev. #0 (03/13/14)

Page 20
Image 20
Multiquip ga6HEB manual Inspection/Setup, General Inspection Prior to Operation Ground Power Tools, Extension Cable, Danger