14
INSTALLATION
WALL AND CEILING PROTECTION
HORIZONTAL VENT SECTIONS: A minimum clearance of 2" all around the vent pipe in all horizontal runs to combustibles is required. Use fi restop spacer
VERTICAL VENT SECTIONS: A minimum of 1" all around the vent pipe on all vertical runs to combustibles is required. Use fi restop spacer
VENT HEAT SHIELD INSTALLATION
The vent heat shield must be
FIGURE 15installed only when terminat- ing horizontally with no vertical
rise. Remove the two screws nearest the vent collars on the top of the fireplace. Align the vent heat shield (sup- plied) and secure. Adjust the vent heat shield to touch the fi restop spacer.
HORIZONTAL INSTALLATION
of 48" away from the front face of the unit.This application occurs when venting through an exterior wall. Having de- termined the air terminal location, cut and frame a hole in an exterior wall. The recommended framed opening is
FIGURE 17c
VERTICAL INSTALLATION
147/16" W x 161/4" H.
See figure16.
This application occursFIGURE 18 when venting through
a roof. Installation kits for various roof pitches are available from your Napoleon® dealer. See Accessories to order the specifi c kit required.
FIGURE 16
ADJUSTABLE FIRESTOP INSTALLATION
Apply a bead of caulking all around and place the fi restop top, so that the vent shield covers the top of the vent within the opening.
NOTE: THE FIRESTOP ASSEMBLY MUST BE INSTALLED WITH THE VENT SHIELD TO THE TOP.
The length of the vent shield may be cut shorter for combustible walls that are less than 8 1/2" thick but the vent shield must extend the full depth of the combustible wall.
Place the fi restop bottom against the fi restop top and secure the two together. Adjust the assembly to ensure it is tight to the vent. Secure fi restop to wall. This restricts cold air from being drawn into the room or around the fi replace. Ensure that both spacer and shield maintain the required clearance to combustibles. Once the vent pipe / liner is installed in its fi nal position, apply high tempera- ture sealant
VENT
SHIELD
FIRESTOP
TOP
FIGURE 17a
FIRESTOP
BOTTOM
FIGURE 17b
1.Determine the air terminal location, cut and frame
123/4" x 123/4" openings in the ceiling and the roof to provide the
minimum 1" clearance be-FIGURE 19 tween the fi replace pipe /
liner and any combustible material. Try to centre the exhaust pipe location mid- way between two joist to prevent having to cut them. Use a plumb bob to line up the centre of the openings.
DO NOT FILLTHIS SPACE
WITH ANY TYPE OF MATERIAL.
A vent pipe shield will prevent any materials such as insulation, from filling up the 1" air space around the pipe. Nail headers between the joist for extra support.
2.Apply a bead of caulking (not supplied) to the framework or to the Wolf Steel vent pipe shield plate or equivalent (in the case of a finished ceiling), and secure over the opening in the ceiling. FIGURE 19. A firestop must be placed on the bottom of each framed opening in a roof or ceiling that the venting system passes through. Apply a bead of caulking all around and place a fi restop spacer over the vent shield to restrict cold air from being drawn into the room or around the fi replace. Ensure that both spacer and shield maintain the required clearance to combustibles. Once the vent pipe / liner is installed in its fi nal position, apply sealant between the pipe / liner