NAILING TAB INSTRUCTION

1)Attach the nailing tabs to the corner posts using the 2 sheet metal screws supplied. Secure through the centre of the top and bottom slots in the nailing tab and then through the existing holes in the corner posts.

If there are no existing holes, follow these instructions: Position the nailing tab so that the front face is offset with the front edge of the corner post (approx. ½”). Centre the nailing tab vertically on the corner post. (FIGURE 6a) Drill

through the centre of the top and bottom slots in the nailing tab. Secure using the two sheet metal screws supplied. This allows the nailing tab to slide back and forth for desired framing. (FIGURE 6b)

2)To determine the final location of the nailing tab you must first determine the width of your finishing material (i.e. drywall). This will determine the dimension from the front edge of the corner post to the nailing tab. Once the nailing tab is in the desired location, drill through the centre hole of the

nailing tab. Secure with a sheet metal screw*. (FIGURE 6c)

* Additional set screws may be installed.

MANTEL CLEARANCES

Combustible materials may be installed flush with the front of the ventless firebox enclosure but must not cover any of the black face-areas of the ventless firebox enclosure. Non-combustible material (brick, stone or ceramic tile) may protrude in these areas.

Combustible mantel clearance can vary according to the mantel depth. Use the graph to help evaluate the clearance

FIGURE 7

MANTEL

COMBUSTIBLE

MANTEL MATERIALS

7"

MANTEL

6" 4"

STUD

TOP

OF UNIT

 

FIGURE 8

 

7

 

 

 

 

M H

6

 

A

E

5

 

N

I

4

 

T

G

 

 

H

 

 

E

T

 

 

L

 

4 5 6 7

 

 

MANTEL

WIDTH

7

CORNER

POST

NAILING

TAB

TOP

SLOT

FIGURE 6a

 

FIGURE 6b

FINISHING MATERIAL

CENTRE HOLE

FIGURE 6c

W415-0527/ 09.29.05

Page 7
Image 7
Napoleon Fireplaces ZCVF36, ZCVF42 installation instructions Nailing TAB Instruction, Mantel Clearances