![](/images/new-backgrounds/1150793/15079349x1.webp)
3 X
3 X
1 X
21Sear Plate, Grid and Warming Rack Installation.
Insert sear plates into base, positioning one over each tube burner with slots down to allow drippings to travel through.
Rest warming rack on brackets inside hood, and insert grids into unit so they sit on back and front lip of base.
22Rotisserie Kit Installation
25