4-34 Upgrading Your System
10.
Connect the interface and power cables to the device as follows (see Figure
above):
! If you are installing a 5 1/4-inch tape drive or other IDE device, align and
connect the drive signal cable and the system power cable to their
connectors. The cable connector for the 5 1/4-inch device is keyed to fit
only in the correct position. The red edge of the cable goes to pin 1 on the
cable connector. Align the red edge of the connector with pin 1 (notched
end) on the drive connector.
! If you are installing a SCSI device, connect the SCSI cable and system
power cable. Be sure to align the SCSI cable connector (not keyed) with
the device connector.
11.
Carefully reinstall the front system bezel by inserting its top plastic tabs into
the chassis top tab slots and then pushing its bottom portion straight in
against the chassis (see Figure below).
12.
Close the front door, reinstall the side panel, and power on the system.
Installing the Front System Bezel