NEC N8103-102 manual Disk array controller Screws BBU

Models: N8103-102

1 60
Download 60 pages 2.54 Kb
Page 60
Image 60
Battery cable

38

15.Install the BBU and the disk array controller to the PCI slot of the server as before and fix it with the screw.

Disk array controller

Screws BBU

16.Connect all the cables to the server and the disk array controller as before.

17.Install the removed side cover and power cords to recover the original state. Turn on the power of the server.

18.After OS is booted, check whether the BBU is recognized correctly. For the checking procedure, see "2. Checking by Utility" in "Chapter 2 Installation of BBU".

„The battery pack provided as a maintenance part is not charged at all. For such battery pack, the value of "Voltage" is indicated as "Now Reading..." on WebPAM.

Notice „ WebPAM may not able to recognize the battery pack if it is charged only at the minimum level (or uncharged). If this occurs, charge the battery pack for six hours or longer. Then reboot the server and try to recognize the battery pack again by using WebPAM.

The battery pack is recyclable. Contact your service representative for the recycle.

Check

Page 60
Image 60
NEC N8103-102 manual Disk array controller Screws BBU