UNPACKING AND INSTALLATION
This chapter provides unpacking and setup information for the Switch.
Unpacking
Open the shipping cartons of the Switch and carefully unpacks its contents. The carton should contain the following items:
■One
■One AC power cord, suitable for your area's electrical power connections
■Four rubber feet to be used for shock cushioning
■Screws and two mounting brackets
■This Guide
If any item is found missing or damaged, please contact your local reseller for replacement.
Installation
The site where you install the Switch stack may greatly affect its performance. When installing, consider the following pointers:
■Install the Switch in a fairly cool and dry place. See Specifications for the acceptable temperature and humidity operating ranges.
■Install the Switch in a site free from strong electromagnetic field generators (such as motors), vibration, dust, and direct exposure to sunlight.
■Leave at least 10cm of space at the front and rear of the hub for ventilation.
■Install the Switch on a sturdy, level surface that can support its weight, or in an EIA
■When installing the Switch on a level surface, attach the rubber feet to the bottom of each device. The rubber feet cushion the hub and protect the hub case from scratching.
Rack Mounting
The switch can be mounted in an EIA
www.netcomm.com.au | Rev.1 - YML623 |
Page 6 |