Chapter 2

Installation

This chapter describes the installation procedures for your NETGEAR Smart Switch. Switch installation involves the following steps:

Step 1: Preparing the Site

Step 2: Installing the Switch

Step 3: Checking the Installation

Step 4: Connecting Devices to the Switch

Step 5: Installing an SFP GBIC Module

Step 6: Installing a Device

Step 7: Applying AC Power

Step 8: Managing the Switch through a Web Browser or the PC Utility for Initial Configuration

Step 1: Preparing the Site

Before installing the switch, ensure the operating environment meets the requirements in the following table.

Table 2-1. Site Requirements

Characteristics

Requirements

 

 

Mounting

Desktop installations - Provide a flat table or shelf surface.

 

Rack-mount installations - Use a 19-inch (48.3-centimeter) EIA standard equipment

 

rack that is grounded and physically secure. The rack-mount kit supplied with the switch

 

is also required.

 

 

Access

Locate the switch in a position that allows access to the front panel RJ-45 ports, the ability

 

to view the front panel LEDs, and easy safe access access to the power connector.

 

 

2-29

v1.0, November 2007

Page 16
Image 16
NETGEAR 748TS, 724TS manual Chapter Installation, Preparing the Site