GS700TS Hardware Installation Guide
Figure
The device is “Plug and Play” in terms of stacking connection and configuration. Before powering up the device, connect the devices into the required stacking topology. The Stacking Master and slave designations are configured through automatic discovery. Manually changing the stacking configuration is through switch web page once the device has been booted and is operational.
For more information on stacking see the NETGEAR Smart Switch User Guide.
Step 7: Applying AC Power
NETGEAR Smart Switch does not have an ON/OFF switch. The method of applying or removing AC power is by connecting or disconnecting the power cord. Before connecting the power cord, select a grounded
1.Connect the female end of the supplied AC power adapter cable to the power receptacle on the back of the switch.
2.Connect the