Chapter 2

Installation

This chapter describes the installation procedures for your NETGEAR Smart Switch. Switch installation involves the following steps:

“Step 1: Preparing the Site”

“Step 2: Installing the Switch”

“Step 3: Checking the Installation”

“Step 4: Connecting Devices to the Switch”

“Step 5: Installing an SFP GBIC Module”

“Step 6: Applying AC Power”

“Step 7: Managing the Switch through a Web Browser or the PC Utility for Initial Configuration”

Step 1: Preparing the Site

Before installing the switch, ensure the operating environment meets the requirements in the following table.

Table 2-1. Site Requirements

Characteristics Requirements

Mounting

Desktop installations - Provide a flat table or shelf surface.

 

Rack-mount installations - Use a 19-inch (48.3-centimeter) EIA standard equipment

 

rack that is grounded and physically secure. The rack-mount kit supplied with the switch

 

is also required.

 

 

Access

Locate the switch in a position that allows access to the front panel RJ-45 ports, the ability

 

to view the front panel LEDs, and easy safe access to the power connector.

2-1

v1.0, October 2008

Page 17
Image 17
NETGEAR GS700AT Series manual Chapter Installation, Preparing the Site