Chapter 2

Hardware Installation

This chapter explains how to install the hardware for the ProSafe™ 24-Port L2 Managed Switch with Static Routing GSM7224R and the ProSafe™ 48-Port L2 Managed Switch with Static Routing GSM7248R.

Package Contents

The switch is packed and shipped separately. The package contains the following items:

Managed Layer 2 Switch with preinstalled software

Power adapter cord

Rubber footpads for tabletop installation

Rubber caps for the SFP sockets

Rack-mounting kit

Null-modem serial cable (RS-232) with 9-pin connectors

Resource CD: The CD contains

Configuration software

Documentation including the Managed Layer 2 Switches 7200R Series CLI Reference Manual Version 7.0, the NETGEAR 7000 Series Managed Switch Administration Guide Version 6.0, the NETGEAR Installation Guide 7000 Series Managed Switch (7200R, 7300S), and this guide

Warranty and Support card

Installation guide

ProSafe NMS100 Network Management System 30-day trial CD-ROM

2-1

v1.0, November 2007

Page 17
Image 17
NETGEAR GSM7248R manual Chapter Hardware Installation, Package Contents