Reference Guide for the Model RT210/RT211 ISDN Routers
2-2 Installing and Connecting
• 9-pin D-connector to 25-pin D-connector adapter
• RJ-45 two-way splitter
• This guide
• Getting Started Using FirstGear
• Two 3.5-inch FirstGear installation diskettes
• Four rubber feet
• Four Velcro feet
• Two Velcro pads
• Warranty/Registration card
Call your dealer if there are any wrong, missing, or damaged parts. Keep the carton, including the
original packing materials, to repack the router if there is a need to return it for repair.
Site PreparationBefore you begin installing the router, prepare the installation site. Make sure the operating
environment meets the physical requirements of the router. The ambient temperature must be
between 0° C and 40° C. The maximum relative humidity must not exceed 90%.
The router should be installed on a flat surface in a clean, dry location. You should ensure that all
units to be connected are within reach of the cables and power and that all are functioning
correctly.
ChecklistsCheck the following ISDN Service Checklist and Network Checklist to make sure that all
requirements are met and that your network is properly configured.
NGRRT210.BK Page 2 Friday, October 17, 1997 2:37 PM