Contents
Main
MODEL 261 NON-CATALYTIC UNIT
Page
TABLE OF CONTENTS
INSTALLATION, OPERATION, AND MAINTENANCE INSTRUCTIONS MODELS 261
READ THIS FIRST IMPORTANT INSTRUCTIONS
WARNING
CAUTION
CAUTION
SECTION I
INTRODUCTION
POSSIBLE TOOLS NEEDED FOR INSTALLATION
INSTALLATION PREPARATION
Page
SECTION II RESIDENTIAL FREESTANDING VERTICAL EXIT INST ALLATION
Floor Protection:
Page
PREPARING THE ROOM HEATER LOCATION
NOTE:
CHIMNEY
CAUTION: Certain installation types require the use of certain chimney types.
HOW TO LOCATE CHIMNEY EXIT, AND INSTALL
A. Vertical exit using
G
D
E
A
Page
B
G
D
E
A
F
Page
C. Vertical wall exit using
(6" Single Wall Pipe minimum 24 ga. blued or black pipe and elbow
pipe, and any listed 2100 UL 103 HT. TYPE Chimney and Listed 2100 UL HT T-Box assembly
NOTE:
Page
D. Vertical wall exit using (6" DVL Close Clearance pipe with elbow) ,
With standard close clearance shield and pipe shield.
NOTE:
Page
NOTE:
Page
F. Vertical exit using (6" DVL Close Clearance pipe
with Elbow) into masonry flue. With standard close clearance shield and pipe shield.
SECTION III RESIDENTIAL FREESTANDING REAR EXIT INSTALLATION
table of contents Section III
MINIMUM CLEARANCES TO FLOOR AND COMBUSTIBLES
Floor Protection:
Page
PREPARING THE ROOM HEATER LOCA TION
CHIMNEY
HOW TO LOCATE CHIMNEY EXIT, AND INSTALL
( NOTE: )
MINIMUM CLEARANCES FROM TOP OF UNIT TO MANTEL OR MANTEL SUPPORTS
Page
B. Rear exit into Masonry Flue using (6" DVL Close Clearance
pipe). With standard close clearance shield and pipe shield.
Page
C. Rear exit
Vertical then to Horizontal into Masonry Flue
DVL Close Clearance
DVL CLOSE CLEARANCE PIPE
pipe, minimum 24 ga. blued or black pipe) .
With standard close clearance shield and pipe shield
NOTE: For minimum clearances (See Figure 23).
INSTALLATION PREPARATION
( NOTE: )
8"
SECTION IV Alcove Installation Vertical or Horizontal Exit
refer back to table of contents Section IV
MINIMUM CLEARANCES TO FLOOR AND COMBUSTIBLES
Page
A-1. Vertical Exit Installation HOW TO LOCA TE CHIMNEY EXIT, AND INSTALL
Page
A-2. Vertical Exit Installation HOW TO LOCA TE CHIMNEY EXIT, AND INSTALL
A
NOTE:
B
E
F
B-1. Rear Exit Installation HOW TO LOCA TE CHIMNEY EXIT, AND INSTALL
A
B
E
F
FINAL CHECK
CAUTION
SECTION V FREESTANDING MOBILE HOME INSTALLA TION
Floor Protection:
Page
FREESTANDING MOBILE HOME INSTALLATION
PREPARING THE ROOM HEATER LOCATION
CAUTION
Page
Page
Page
FINAL CHECK
CAUTION
SECTION VI WOOD HEATER SAFETY
CAUTION
SECTION VII OPERATION
BUILDING A FIRE
SECTION VIII TROUBLESHOOTING
PROBLEM POSSIBLE CAUSE SOLUTION
Page
PRODUCTS COVERED
PRODUCTS NOT COVERED
WARRANTY TIME PERIODS
PROCEDURE
CONDITIONS AND EXCLUSIONS
OTHER RIGHTS