NVS 6

MANUAL

Table 6

Procedure

Maintenance check intervals, hours (months)

 

and parameter under

50

100

200

 

check

(6 months)

(12 months)

(24 months)

 

 

 

 

 

 

1 Cleaning lens and

+

+

+

 

eyepiece external

 

 

 

 

surfaces

 

 

 

 

 

 

 

 

 

2 Inspection:

 

 

 

 

Inspecting the night-

+

+

+

 

vision goggles and their

 

 

 

 

accessories for external

 

 

 

 

condition

 

 

 

 

Checking the unit set

+

+

+

 

for completeness

 

 

 

 

Testing the night-vision

+

+

+

 

goggles and their

 

 

 

 

accessories for

 

 

 

 

serviceability

 

 

 

 

Checking the night-

+

+

+

 

vision goggles for image

 

 

 

 

quality (resolving power)

 

 

 

 

 

 

 

 

 

3 Periodic inspection:

+

+

+

 

Checking screws for

 

 

 

 

proper tightness and

 

 

 

 

inadvertent loosening

 

 

 

 

Adjustment of retainers

+

+

+

 

force for locking in

 

 

 

 

operating position (if

 

 

 

 

required)

 

 

 

 

 

 

 

 

 

 

 

 

Page 48

Page 53
Image 53
Newcon Optik NVS 6 operation manual Nvs