14.Pull the Cable (25) down in the indicated location, so there is no slack at the ends of the Cable.
Locate the other Cable (25). Insert the
Route the
15.Wrap the upper Cable (25) around a Pulley (24) as shown. Attach the Pulley and a Cable Trap (23) to the two Pulley Plates (17) using an M10 x 45mm Bolt (32) and an M10 Nylon Locknut (29).
Wrap the lower Cable (25) around a Pulley (24) as shown. Attach the Pulley and a Cable Trap (23) to the Pulley Plates (17) using an M10 x 45mm Bolt (32) and an M10 Nylon Locknut (29).
Make sure the Bolts (32) are in the highest and lowest holes in the Pulley Plates (17). In addition, make sure the Cables (25) are between the Cable Traps (23) and the Pulleys (24).
16.Wet the ends of the Lat Bar (45) with a small amount of soapy water. Slide the Handgrips (47) onto the ends of the Lat Bar.
17.Make sure all parts of the weight rack are prop- erly tightened. In addition, pull each cable a few times to make sure the cables move smoothly over the pulleys. If the cables do not move smoothly, locate and correct the problem. When weights are used, the cables may be damaged if they are incorrectly routed.
The use of all remaining parts will be explained in ADJUSTING THE WEIGHT RACK, beginning on page 11.
14 |
|
|
|
|
| 25 |
|
|
| 25 |
|
|
| 24 |
|
|
| 37 40 |
|
|
|
| 4 |
| 29 |
| 40 |
|
| 37 | |
|
|
| |
|
| 2 | 34 |
|
|
| |
|
|
| 32 |
15 |
| 25 |
|
|
| 17 | 24 |
|
|
| |
| 29 |
| 23 |
|
|
| |
|
|
| 17 |
|
|
| 32 |
|
|
| 23 |
|
| 25 |
|
16 |
|
|
|
|
|
| 45 |
| 47 |
|
|
|
|
| 47 |
10