Nordyne Q4 Series installation instructions Three Phase 60Hz

Models: Q4 Series

1 19
Download 19 pages 34.75 Kb
Page 18
Image 18

18

Figure 8. Single Phase Wiring Diagram

Convertible Packaged Heat Pump

460 Volt

NNOTES:

1.Disconnect all power before servicing.

2.For supply connections use copper conductors only.

3.If any of the original wire as supplied with the furnace must be replaced, it must be replaced with wiring material having a temperature rating of at least 105°C.

4.For supply wire ampacities and overcurrent protection, see unit rating plate.

Three Phase

60Hz

1.Couper le courant avant de faire letretien.

2.Employez uniquement des conducteurs en cuivre.

Page 18
Image 18
Nordyne Q4 Series installation instructions Three Phase 60Hz