Nortec Industries NHRS Series B.Products, 4Extra Material, 5References, 6Coordination, 10-20

Models: NHRS Series

1 26
Download 26 pages 63.63 Kb
Page 20
Image 20
(4)Extra Material

(4)Extra Material

(a)Furnish extra materials described below that match products installed and that are packaged with protective covering for storage and identified with labels describing contents.

(5)References

(a)ANSI/NFPA 70 - National Electrical Code.

(6)Coordination

(a)Coordinate location and installation of humidifiers in ducts and air-handling units. Revise locations and elevations to suit field conditions and to ensure proper humidifier operation.

XXXXXOR XXXXX

(a)Coordinate location and installation of humidifier in the space it serves with the electrical, mechanical, and plumbing contractors.

B.PRODUCTS

(1)RESISTIVE STEAM HUMIDIFICATION SYSTEM NORTEC MODEL NHRS

(a)Packaged unit, wall mounted, electric steam generating system, suitable for use with potable, De-Ionized (DI), and Reverse Osmosis (RO) water. UL Listed

(b)Methods of distribution require a steam distributor[s] or Short Absorption

Manifold [s] [SAM-e] for mounting into AHU/duct[s] or Remote Mounted Blower Pack[s] [RMBP] for direct space applications [refer to options schedule].

(c)Includes stainless steel tank and fill through plastic base to control water stratification by filling at the bottom. Top filling is not acceptable.

(i)Incoloy based resistive heating elements are used to produce steam. Steam production is fully variable from 0 to 100%.

(ii)Control accuracy of up to ±1% using DI/RO water, optional SSR control, and precise humidistat on all models.

(iii)Keypad programming to configure monitor and control humidifier with information messages on alphanumeric LCD display.

(iv)Unit water level is to be continuously monitored with a dual magnetic electronic float system, located outside of the boiling water to ensure

accurate water level control and reduced maintenance. Cool fill water is to be supplied into the sensing chamber to keep the device cool. Systems using conductivity probes or floats located within hot reservoir water are not acceptable.

(v)Self-diagnostics during start-up of system to prevent unsafe operation on the unit(s).

(vi)Fill valve check.

10-20

Page 3 2008-02-18

Page 20
Image 20
Nortec Industries NHRS Series manual B.Products, 4Extra Material, 5References, 6Coordination, 10-20