(vii)Float level check.
(viii)Drain pump check.
(ix)Dual signal status light indicates unit operation.
(x)Cabinet has powder coated paint finish with removable door to allow the user full front access.
(xi)Plumbing door interlock safety switch.
(c)Factory mounted, alpha numeric, Liquid Crystal Display (LCD) provides full operational status. Display to include a keypad for user interface and adjustment of operational parameters including:
(i)Unit output (lbs/hr or kg/hr).
(ii)Control demand status.
(iii)Relative humidity display when using transducer input(s).
(iv)Humidity
(v)Controller configuration (Proportional band and Integral) when using transducer input(s).
(vi)Control type configuration on/off or full modulation when demand signal(s), or transducer input(s) are provided.
(vii)Language setting: English, French.
(viii)Fault indication using text. Code
(ix)Manual capacity output adjustment range of
(x)Option for BACnet, LonWorks, Johnson N2 or Modbus interface for monitoring and control from a Building Management System (BMS).
(xi)Standard of acceptance: NORTEC NHRS.
(xii)UL Listed.
C. EXECUTION
1.EXAMINATION
(a)Examine ducts,
(b)Examine
(c)Proceed with installation only after unsatisfactory conditions have been corrected.
2.INSTALLATION
(a)Install humidifiers and steam dispersion panels per manufacturers’ instructions.