NuTone warranty ALLURE WS2 SERIES, Range Hood, Page, Ducted Installation - Skip to Step

Models: WS2

1 16
Download 16 pages 22.4 Kb
Page 3
Image 3
ALLURE® WS2 SERIES

 

 

ALLURE® WS2 SERIES

 

 

RANGE HOOD

 

 

 

 

 

 

 

 

Page 3

PREPARE THE HOOD

 

PREPARE THE HOOD

ELECTRICAL

CABLE CLAMP

4 Remove either top or back wiring knockout and install RANGE HOOD approved Electrical Cable Clamp.

Ducted Installation - Skip to Step 11.

The following Steps (5 thru 10) are for

NON-DUCTED INSTALLATION ONLY.

6

Remove Air

 

Chute - held in

 

place with one

 

(1) screw.

NOTE: Be careful not to disconnect any wires.

7

Remove Baffle

 

from air chute.

 

Tabs will

 

disengage

 

from Slots.

AIR CHUTE

BAFFLE

SLOTS TABS

(3) #8 SCREWS

 

(2) #8 SCREWS

LIGHT

PANEL

5 Remove Light Panel - held in place with (3) #8 screws and Page 3 (2) #8 screws. Disconnect light assembly wire harness

(white connector).

SUPPORT FIN

8 Rotate baffle. Reinsert Ducted Installation - Skip to Step 11. baffle into air chute (as

shown) so that baffle fits all the way into into air chute. An audible “click” will be heard when fully installed.

This will direct air flow through the non-ducted slots on top of hood.

9 Re-install air chute and screw,

re-connect wire harness, and replace light panel.

NOTE: Be careful not to trap wires between Support Fin and light panel.

Page 3
Image 3
NuTone warranty ALLURE WS2 SERIES, Range Hood, Page, Ducted Installation - Skip to Step, Prepare The Hood