STEP 3 : HINGE,BASE AND LEGS INSTALLATION
| Open Box VP3. |
1 | Fasten one HINGE (found in |
| door box) to the SIDE of the |
cabinet | H |
|
2Install four LEGS (H) into BASES fully in.
3 | Fasten FRONT | BASE | to |
| the BOTTOM of | the cabinet | |
| (FRONT BASE has to be set | ||
| with end tabs away from front | ||
| edge) |
|
|
4 | Fasten BASE with | HEX BOLTS | |
| (B) |
|
|
1
4
NOTE: Fasten base with base tab away from the front edge, then fasten and adjust the hinge before fully tightening HEX BOLTS (B)
2
H
H
B
3
D 1
5
5Raise cabinet and check for potential air
~7~ | leaks at panel joints from inside. |
|