Nuvo 500, 250 operation manual Shelves

Models: 250 500

1 16
Download 16 pages 46.32 Kb
Page 8
Image 8
STEP 4 : SHELVES

STEP 4 : SHELVES

1Install COUPLER SHELVES between the VERTICAL COUPLER and the BACK PANEL, hook them on the

COUPLER HANGERS (G)

2Install 4 HANGERS STRIPS, hook- ing them to the COUPLER SHELVES through square holes. (Watch for orientation, all hooks have to point upwards).

NOTE : Assure that each of them is hooked to all 4 shelves

PRESS

TOP Manual background

BOTTOM Manual background

3

COUPLER SHELVES

1

 

G

2

VERTICAL COUPLER

3

Open box VP4S or VP4D

Hook

SHELVES into hangers start-

 

1

2

ing from the bottom of cabinet, (12

shelves on cooling unit side, 14 on

the other) alternating the two sides

HINT :

CENTER SHELVES ON HANGERS

1Snap SHELVES into hangers on one side

2 Push the SHELVES down to snap into op- posite side hangers

~8~

Page 8
Image 8
Nuvo 500, 250 operation manual Shelves