Panasonic FV-05-11VK1 Installation Plug ‘N Play Function Devices, Installation New Construction

Models: FV-05-11VK1 FV-05-11VKS1 FV-11-15VK1

1 12
Download 12 pages 22.35 Kb
Page 8
Image 8
INSTALLATION (PLUG ‘N PLAY FUNCTION DEVICES)

INSTALLATION (PLUG ‘N PLAY FUNCTION DEVICES)

You can purchase the specified Plug ‘N Play devices that are explained on page 6-7 and install them in positions

INSTALLATION (NEW CONSTRUCTION) , 2 and 3 . PositionFig.1 can only be used with Multi-Speed module (model FV-05-11VKS1 already have this control installed), position 2 and 3 can be used for any of the other optional control modules.

1.Remove the connector cover from position Manual background , 2 or 3 .

2.Plug in the specified devices to Base PCB box and fix to the slot, till hear the sound installed in place.

Connector

Base PCB box

 

cover

Slot

 

 

2

 

2

3

3

 

 

 

Clasp

Squeeze tabs on the Clasp to remove. Squeeze, insert and release the tabs on Clasp to replace.

INSTALLATION (NEW CONSTRUCTION)

The fan position between joists from 16" to 24" on center can be adjusted flexibly.

Manual backgroundManual background CAUTION

Please wear gloves during the installation work as follow.

1.Disconnet plug connector from receptacle and remove adaptor from fan body by removing the machine screw (M4X6) before installation. (Fig.1)

IMPORTANT:

Remove the tape from damper and adaptor before installation. As shown below:

Adaptor

Damper

Tape

2.Bend down 4 tabs for positioning, install the Flex-Z FastTM bracket to joists by using 2 tapping screws(ST4.2X20) (Please prepare the screws and put on Flex-Z FastTM bracket before Flex-Z FastTM bracket is installed on joist). (Fig.2)

3.Adjust the length of Flex-Z FastTM bracket as the spacing between joists, and install to joists by using 2 tapping screws (ST4.2X20). (Fig.3)

4.Remove junction box cover and secure conduit or stress relief to junction box knock-out hole. (Fig.4)

5.Install a circular duct and secure it with clamps,

or ties and seal it with mastic or approved foil tape. 4 inch 6 inch circular duct is needed to connect to relevant part of common adaptor. (Fig.4)

6.Install the adaptor to Flex-Z FastTM bracket by using 2 self-drilling screws. (Fig.4)

Machine screw

Adaptor

 

(M4X6)

 

Fan body

Fig.1

Joist Manual backgroundManual backgroundManual background

 

Bend down

 

4 tabs

2 Tapping screws

Fig.2

(ST4.2X20)

 

Joist

 

2 Tapping screws

Fig.3

(ST4.2X20)

 

 

Circular duct

Conduit

Mastic or

 

approved

 

foil tape

Knock-out

 

hole

 

Junction box

 

cover

2 Self-drilling screws

 

 

Fig.4

8

Page 8
Image 8
Panasonic FV-05-11VK1, FV-11-15VK1, FV-05-11VKS1 Installation Plug ‘N Play Function Devices, Installation New Construction