INSTALLATION (NEW CONSTRUCTION) CONTINUED
7.Refer to wiring diagram on page 5.
Follow all the local electrical safety codes as well as the National Electrical Code (NEC).
Using UL approved wire nuts, connect house power wires to ventilating fan wires. (Fig.5)
CAUTION
Mount junction box cover carefully so that lead wires are not pinched.
8.Insert fan body and slide into adapter assy with some strength, untill the flange overlaps the
CAUTION
Secure machine screw (M4X6) to the suitable hole and not touch the
9.Finish ceiling work. Ceiling hole should be aligned with the inside edge of the flange. (Fig.7)
10.Remove the tapes from louver and springs before installation. (Fig.8)
IMPORTANT:
Replace the sensor cover before the installation (only for
Keep on pressing the clasps when removing the ornamental cover.
Gloves
Ornamental cover
Insert the sensor cover (attachment for
Sensor cover
11.Insert the grille mounting spring on the wiring side into the slot. (Fig.9)
12.Plug in the specified devices as your choice (refer to installation on page 8). Insert the motion sensor
Conduit Earth ground | |
to green | |
| Wire nut |
Junction |
|
box |
|
| Netural to white |
| Two red wires |
| (Connect to a general |
Live to black | manual wall switch) |
|
|
| Fig.5 | |
Joist |
|
| |
Plug connector |
|
| |
| Machine |
| |
| screw |
| |
| (M4X6) |
| |
Receptacle | 2 |
| |
screws | Fig.6 | ||
|
10 | 1/2 | (270) | Ceiling | Unit: inches (mm) |
| 10 |
| ||
|
|
| ||
|
|
|
| |
|
|
| 1/2 |
|
|
|
| (270) |
|
After finishing the ceiling job, fill gap between flange | ||||
and ceillng with caulk or other sealant to prevent air | ||||
leakage |
| Fig.7 | ||
|
|
|
|
Tapes
| Fig.8 |
| Clasp |
Ceiling |
|
Motion sensor |
|
LED night light | |
| |
| |
| Fig.9 |