STEP 7

View from front of Stand

Front Rail

Front Rail

 

Front Moulding

Front Moulding

Ensure that Front Rail, Front Moulding and Base are all flush on outside edge.

1.Fasten the Front Rails and Front Mouldings to the Base while holding them flush with outside edge of Stand using 2 Locking Screws.

Page 10
Image 10
Panasonic TY-42PV30NZ manual View from front of Stand