*All connections use one 3/8 X
7 | 36 |
19 | 36 41 |
26
6
21
20
FIGURE 14
STEP 14
•Securely assemble the WEIGHT STACK CABLE (26) and two
•Hang the FLOATING PULLEY BRACKET (6) over the WEIGHT STACK CABLE (26) as shown in FIGURE 14.
•Screw the threaded end of the WEIGHT STACK CABLE (26) into the end of the WEIGHT STACK SHAFT (21) until the FLOATING PULLEY BRACKET (6) firmly contacts the FRONT UPRIGHT (2) and the CABLE (26) slightly pulls on the HEAD PLATE (20). Tighten the jam nut securely. See FIGURE 14.
| 1/2 |
| 1/2 |
| 1/2 |
| 1/2 |
| 1/2 |
|
| 1/2 |
0 | 1 | 2 | 3 | 4 | 5 | 6 |
14