iTEM I.
4.
5.
6.
7.
g.
9.
10.
NAME/D ESCtLIPTION |
|
| QTY | |
3/8xl IN.BOLT | ~ | 1 | ||
318X2 IN.BOLT | : | I | ||
~..~ | 2 | |||
1/4INWASHER | 2 | |||
| ||||
3/8IN.WASHER | ,.., | |||
~ 2 | ||||
3/8INLOCK.NUT |
| 4 | ||
SNAPLINK |
| I | ||
I~EYHOLECLEVIS | : |
| ||
PULLEYBRACKET | 1 | |||
|
|
,VCELDMENTS/PARTS: |
|
|
|
|
| |
ITEM | NAME/DESCRIPTION | (31i6201) |
|
| QTY | |
I. |
|
| 3 | |||
2. | PECDECCABLE | (653S601) |
|
| : I | |
3. | ABCABLE | (653S801) |
| 1 | ||
| LEGCABLE | ........(6569001) | ~ | ~ | ...............................; | I |
5. | (6013703) |
| 2 | |||
|
|
I
~
FOmaZrZ~~~:AR~.~O..~E.~trSE~z ..wr_7ni.~.!
. To a~scmble the PECDECCABLE,follow ~c cable routing dia~ on d~wing,~d use ~e following steps:
¯Assemble each end of the PECDECCABLEto ~e ~EC CAMS.
-Dmp~ ~e CABLEover ~e P~LEYS on ~c CENTERPULLEYB~C~T. ~HIS WILL FO~I A LOOP IN
THE CENTER OE THE CABLE)
*Positiqn .the CABLERETAININGCLIPSin a 45 DEGREEposition over the P~LEYSand the CABLES,~d tighmn the two (2) PULLEYconnections SECURELY.
Toassemblethe ABCABLE,follow the cable routing diagramon drawing,and use the following steps:
¯Attach one (1) SNAPLINKto the ball end of the ABCABLE.
¯Insert the threaded end of the ABCABLEbetweenthe top of the ABPULLEYand the BOLTin the FRONT UPRIGHT.
WASHERS,and two (2) 1/4~28 .IN. NUTS. (LOCATEPULLEY.BRACKETHALFWAYUP ON THREADSOF THE AB CABLE. DO NOTTIGHTENN"UTS AT THIS TIME)
¯ ' Make'aloop with the
LOOSELYassemble two (2)
SECURELYattachtheLEG:CABLEto the~LEG.CURI~EXTusingone(I)318X I IN.BOLT,two (2).3/gIN.
.WASHERS,andone (I)3/8'.IN..LOCKNUT..
Routethe LEGCABLEas shownin drawing.
Runthe LEGCABLEthrough the | hole¯ of the |
the end of the LEGCABLE. | .. |
THIS CONCLUDESTHEASSEMBLYOF (LEVEL, 7)
425101 HOMEGYMASSEMBLYPARTS LIST (LEVEL .8)
13