704101 REGGIE WHITE ALL PRO SYSTEM ASSEMBLY INSTRUCT, IONS~
Insert the LEFT and RIGHTPEC DECARMSthrough the 1/2 IN. FLANGEBEARINGSin the
21.BEARINGHOUSINGon their respective sides as shown on drawing, and SECUREthem in place with two (2) ~ 2 IN. ID.
22.Slide tx~o (2) 4 X 12 ROLLERPADSonto :he LEFT and RIGHTPEC DECARMSuntil the ROLLER PAD is ,:LUSH with the bottom of the ARMS.(IF A LUBRICANTIS REQUIRED,COATTHE
INSIDE OF THE ROLLER PAD WITH RUBBING ALCOHOL. ALSO, ROTATING THE PAD WHlLE PUSHING UP WILL HELP TO EASE ASSEMBLY)
23.Attach ~wo (2) CARRIAGEGUIDESto the CAMSTOP on the BEARINGHOUSINGwhere the CAMS of the PEC DECARMScontact the CAMSTOP.
24.LOOSELYassemble two (2)
3/8 IN. WASHERS,and two (2) 3/8 IN. LOCKNUTS. (NOTE: THIS CONNECTIONWILL TIGHTENED AFTER THE CABLE HAS BEEN ROUTED)
SECURELYassemble the SMALLBACKPAD to the UPRIGHTFRAMEas shown on drawing, using
25.
two (2) 3/8 X
26.SECURELYassemble one (I)
PLATESat the bottom of the UPRIGHTFRAMEas shown on drawing, using one (I)
27.LOOSELYassemble two (2)
IN. WASHERS,and two (2) 3/8 IN. LOCKNUTS. (NOTE: THIS CONNECTIONWILL TIGHTENED AFTER THE CABLE HAS BEEN ROUTED)
28.
LOOSELYassemble p, vo (2) CONNECTORPLATESaround two (2)
(2)3/8 X 2 IN. BOLTS, and two (2) 3/8 IN. LOCKNUTS. (NOTE: THIS CONNECTIOt~'WILL
TIGHTENED AFTERTHE CABLE HAS BEEN ROUTED)
NOTE: BEFORE PROCEEDING WITH CABLE INSTALLATION, UNRAVEL CABLES, AND REMOVE AS MUCHSPIRALING AS POSSIBLE.
To ins:zll LOOPCABLE,start by inserting the BALLENDSof the CABLEinto the BUSHINGSon the
29.
CAMSofthe LEFT and RIGHT PEC DEC ARMS.
Drape ~oth sides of the CABLEo(,er the PULLEYSon the BEARINGHOUSINGPosition. CABLE RETAININGCLIPSin a vertical positior, over the PULLEYand CABLE,after the LOOPCABLEhas
been routed. Tighten the PULLEYCONNECTIONcompletely.
¯Place one (1)
and one (1) 3/8 IN. LOCKNUT. (NOTE: MAKESURE THATTHE CABLEIS IN TE[E GROOVE OF THE PULLEY BEFORE TIGHTENING)
¯See CABLEROUTINGDIAGRAMfor help in completing this step.
6
1