FIGURE 18 | 3/8 X | 68 | |
|
|
| 51 37 |
|
| 8 | 71 |
|
|
| |
3/8 X 3” | 67 |
| 69 |
|
|
| 11 |
|
|
| 2 |
3/8 X | 57 | 49 |
|
|
| 63 | |
|
|
| |
| 64 |
|
|
| 37 |
|
|
|
| 30 | 63 |
|
|
|
STEP 18:
•Securely assemble the ball end of the LEG CABLE (30) and one
(NOTE: The LEG CABLE (91) must be routed over the retaining bolt as shown in FIGURE 18.)
•Securely assemble one
(NOTE: The LEG CABLE (91) must be routed over the retaining bolt as shown in FIGURE 18.)
•Assemble one
CABLE (30) around the PULLEY prior to assembling the PULLEY to the BASE PLATES.)
17