FIGURE 28

 

 

 

 

32

 

 

41

 

 

20

 

 

31

 

41

 

 

19

 

35

 

 

59

41

30

 

 

STEP 28:

Assemble two 14-1/2” SEWN HANDLES (19) to the ARM CABLE (31) using two SNAP LINKS (41) as shown in FIGURE 28.

Assemble two 7-1/2” SEWN HANDLES (20) to the BOOM CABLE (32) using two SNAP LINKS (41) as shown in FIGURE 28.

Assemble the ANKLE STRAP (35) to the LEG CABLE (30) using two SNAP LINKS (41) and one 12-LINK CHAIN (59) as shown in FIGURE 28.

24

Page 24
Image 24
ParaBody 777 manual Step