FIGURE 11

1

42

40

16

28

31 3/8 X 2”

18

!IMPORTANT!

SECURELY

TIGHTEN

48

13

STEP 11:

Attach the CABLE (18) from the TOP BOOM (1) to the CARRIAGE (13) using one 1/4” QUICK LINK (48) as shown in FIGURE 11.

(IMPORTANT! Securely tighten QUICK LINK.)

Place one 3-1/2” PULLEY (16) into the loop of the CABLE (18) below the second and third PULLEY of the TOP BOOM (1) as shown in FIGURE 11.

LOOSELY assemble two 3/16 X 1-3/4 X 5-1/4” PLATES (28) to each side of the 3-1/2” PULLEY (16) using one 3/8 X 2” BOLT (31), two 3/8” WASHERS (40), and one 3/8” LOCK NUT (42). See FIGURE 11.

 

1/2

 

1/2

 

1/2

 

1/2

 

1/2

 

 

1/2

0

1

2

3

4

5

6

10

Page 10
Image 10
ParaBody 893104 manual Step