BLOCK

~

4-1/2" PULLEY,~

FIGURE 10

STEP10:

"'~~3/8X2"

~UPRIGHTFRAME

3/8X2-3/4"

¯Route the end of the 134-3/4" CABLE(10) through the slot of the UPRIGHTFRAMEthen SECURELYassemble one previ- ously removed 4-1/2" PULLEYto the UPRIGHTFRAMEusing two previously removed 3/8 X 2-3/4" BOLTS,two 3/8" FLANGESPACERS,two 3/8" WASHERS,and two 3/8" LOCKNUTS. (NOTE: The CABLE(10) s]aould be routed between the pulley and the retaining bolt as shownin FIGURE10.)

¯Wrap the CABLE(10) aorund one 3-1/2" PULLEY(8) and SECURELYassemble the PULLEYto the: plate on the UPRIGHT FRAMEusing one 3/8 X 2" BOLT(14), one CABLERETAININGCLIP (13), one 3/8" WASHER(17), and one 3/8"

NUT(18). (NOTE: Before tightening PULLEY,make sure RETAININGCLIP is positioned as shown in FIGURE10.)

¯ WRAPthe CABLE(10) around the bottom 3-1/2" PULLEYof the PULLEYBLOCKasshown in FIGURE10.

1/2

I

1/2

I

1/2

1

1/2

I

1/2

I

1/2

I I I

1

I I I I I

 

 

 

4

I I ~._1

6

 

 

 

 

 

 

10

Page 10
Image 10
ParaBody 894104A manual I I