Installation To Wood Joist Ceilings
WARNING
•Installer must verify that the supporting surface will safely support the combined load of the equipment and all attached hardware and components.
•Tighten wood screws so that projector mount assembly is fi rmly attached, but do not overtighten. Overtightening can damage the screws, greatly reducing their holding power.
•Never tighten in excess of 80 in. • lb (9 N.M.).
•Make sure that mounting screws are anchored into the center of the stud. The use of an "edge to edge" stud fi nder is highly recommended.
•Hardware provided is for attachment of mount through standard thickness drywall or plaster into wood studs. Installers are responsible to provide hardware for other types of mounting situations (Not Evaluated by UL).
Place projector mount assembly (A) on ceiling as a template and mark the center of the two mounting holes.
2 Make sure that the mounting holes are in the center of the wood joist. Drill two 5/32" (4mm) dia. holes to a minimum depth of
NOTE: Mounting slots on projector mount assembly allow for 30° (±15°) of swivel adjustment before fully securing wood screws.
Tighten wood screws (F) using 3/8" (10mm) socket wrench, phillips screwdriver or 10mm open end wrench until projector mount assembly (A) is fi rmly attached.
Skip to step 5.
WOOD JOIST
A
E
F
WOOD JOIST
ARROW ON TOP OF
PROJECTOR MOUNT
ASSEMBLY INDICATES
FRONT OF MOUNT
A
E
fig. 2.1
F fig. 2.2
5 of 13 | ISSUED: |
Visit the Peerless Web Site at www.peerlessmounts.com | For customer care call |