CONTENTS

Section

 

 

Page

1.0

GENERAL

..................................................................................................

3

 

1.1

IMPORTANT SAFEGUARDS AND WARNINGS

3

 

1.2

REGULATORY NOTICES

4

 

1.3

UNPACKING INSTRUCTIONS

5

 

1.4

RECOMMENDED TOOLS

5

2.0

DESCRIPTION

6

 

2.1

MODELS

6

 

2.2

CERTIFICATIONS

6

3.0

INSTALLATION FOR IN-CEILING MODELS

7

 

3.1

CEILING AND BACK BOX PREPARATION

7

 

 

3.1.1

Hard Ceiling

7

 

 

3.1.2

Suspended Ceiling

8

 

3.2

WIRING

8

 

3.3

BACK BOX INSTALLATION

12

 

3.4

BACK BOX CONNECTIONS

13

4.0

INSTALLATION FOR PENDANT MODELS

15

 

4.1

PENDANT-MOUNT INSTALLATION

15

 

4.2

SURFACE-MOUNT INSTALLATION

15

5.0

TROUBLESHOOTING

16

 

5.1

SERVICE MANUAL

16

6.0

SPECIFICATIONS

17

7.0

WARRANTY AND RETURN INFORMATION

20

LIST OF ILLUSTRATIONS

Figure

 

Page

1

Back Box Parts

5

2

Compass Tool

7

3

Conduit Fitting Installation

7

4

Installing Back Box

9

5

Fastening Back Box

9

6

Wiring Diagram for Spectra™ (Ver. 3.0) and Spectra II™

10

7

Wiring Diagram for Spectra™ Lite

10

8

Interconnect Door

12

9

Transformer Wiring

13

10

Interconnect Circuit Board Electrical Connections for

 

 

Spectra™ (Ver. 3.0) and Spectra II™

13

11

Interconnect Circuit Board for Spectra™ Lite

14

12

SD5 Series Dimension Drawing

18

LIST OF TABLES

Table

 

Page

A

Video Coaxial Cable Wiring Distances

.............................................. 8

B

24 VAC Wiring Distances

11

REVISION HISTORY

Manual #

Date

Comments

C1488M

6/98

Original version.

C1488M-A

9/98

Rev A. Revised the manual to incorporate Spectra™

 

 

Lite material.

2

Pelco Manual C1488M-A (9/98)

Page 2
Image 2
Pelco BB5L operation manual Contents