Pelco Installation Manual C1487M-H (1/01) 5

INSTALLATION

The Spectra II™ dome and Spectra Lite™ dome shipping cartons contain three boxes. Inspect each box to make sure all parts are
present.
IN-CEILING MODELS
Back Box
1Back box
1Parts bag
1Conduit fitting
1Safety chain bracket
1Lock nut
1Compass tool
4T-rail clip (clip, L-bracket, screw, lock washer and nut)
Dome Drive
1Dome drive
Lower Dome
1Acrylic lower dome with trim ring
PENDANT MODELS
Back Box
1Back box
1Tube of thread compound
Dome Drive
1Dome drive
Lower Dome
1Acrylic lower dome with trim ring
1Parts bag (O-ring and lubricant, and tube of Loctite)
COMPASS TOOL
SAFETY BRACKET
CONDUIT FITTING & LOCK NUT
T-RAIL CLIP
BACK BOX
DOME DRIVE
LOWER DOME
BACK BOX
DOME DRIVE
LOWER DOME
O-RING
THREAD
COMPOUND LOCTITE®
222MS O-RING
LUBE