All other switches are set to the OFF position.
1 | 2 3 | 4 | 5 | 6 | 7 8 | 1 | 1 | 2 3 | 4 | 5 | 6 | 7 8 |
|
| SW1 |
| on SW2 on |
| SW3 |
| ON | ||||
|
|
|
|
|
|
|
7No DIP switch settings are required for the system. Before installing the dome drive verify that switch
The switches set the dome drive for Pelco’s D protocol, address 1, 2400 baud, and no termination.
8Install the dome drive. Line up the blue (A) and red (B) tabs with the blue
(A) and red (B) labels. Push in the tabs. Insert one side and then the other side. Continue pushing on the ends of the tabs until both sides click into place.
9Install the lower dome. Tighten the Phillips pan head screws to secure the lower dome to the back box.
To operate or program your Spectra III EVS dome drive, refer to the following manuals:
Information Required | Where to Find Information |
|
|
Spectra’s programmable | Spectra III Operation/ |
features, commands, and menu | Programming manual supplied |
structure | with the dome drive or available |
| at www.pelco.com |
|
|
How to control the dome drive | Endura™ WS5000 Advanced |
and access preset 95 with the | System Software Operation |
WS5050 | manual supplied with the |
| WS5050 workstation or |
| available at www.pelco.com |
|
|
How to control the dome drive | Endura VCD5000 Video Control |
and access preset 95 with the | Display Operation manual |
VCD5000 | supplied with the VCD5000 or |
| available at www.pelco.com |
|
|
C2493M (12/05) | 5 |