Pella 80JJ0103 installation instructions 1ROUGH OPENING PREPARATION

Models: 80JJ0103

1 8
Download 8 pages 37.51 Kb
Page 2
Image 2
1ROUGH OPENING PREPARATION

YOU WILL NEED TO SUPPLY:

ss#EDAREOR )MPERVIOUSOSHIMSSPACERSMTO  Manual backgroundManual backgroundManual background ss GALVANIZED ROOlNGlNAILS  LB Manual backgroundManual background ss D NAIL Manual backgroundManual background ss#LOSED CELLEFOAM BACKERLRODSEALANT BACKERN TO CFT

ss0ELLA® SmartFlashfoil backed butyl window and door

flashing tape or equivalent

 

ss(IGHGQUALITYUEXTERIOR GRADE POLYURETHANE ORNSILICONE

SEALANTL TOT TUBES PERODOOR

4&"-"/5

 

ss'REATA3TUFF Window and Door Insulating Foam Sealant by the Dow Chemical Company or equivalent low pressure polyurethane window and door foam - DO

./44USEUHIGH PRESSUREEOR LATEX FOAMS

ss0ELLA ALUMINUMLSILL SUPPORTTOR  X  WOODXBLOCKING ss)NTERIORRTRIM ANDORRJAMB EXTENSIONSO TO MFT

TOOLS REQUIRED:

ss4APEPMEASURE Manual background ss,EVEL Manual backgroundManual backgroundManual backgroundManual background

ss3QUARE

ss(AMMER Manual backgroundManual background ss3TAPLER Manual background ss3CISSORS ORSUTILITY KNIFE

ss3CREWDRIVERSR Manual backgroundManual backgroundManual backgroundManual backgroundManual backgroundManual background

 0HILLIPSLANDPSMALLAmATDBLADE

ss !LLEN WRENCH Manual backgroundManual backgroundManual backgroundManual backgroundManual backgroundManual background ss$RILL Manual backgroundManual backgroundManual backgroundManual background ss3EALANT GUN Manual background

REMEMBER TO USE APPROPRIATE PERSONAL PROTECTIVE EQUIPMENT.

1ROUGH OPENING PREPARATION

A.Verify the opening is plumb and level. Note: It is critical that the bottom is level.

Manual backgroundManual backgroundManual background*OUFSJPS

B.Verify the door will fit the opening. Measure all four sides of the opening to make sure it is 3/4" larger than the door in width and 1/2" larger in height. On larger openings measure the width and height in several places to ensure the header or studs are not bowed.

Note: 1-1/2" or more of solid wood blocking is required around the perimeter of the opening. Fix any problems with the rough opening before proceeding.

£

Manual backgroundManual backgroundManual background*OUFSJPS

C. Cut the water resistive barrier.

BUFS3FTJTUJWF#BSSJFS Manual backgroundTUDVU

 

 

SEDVU

 

 

UIDVU

 

 

.BLFBDVUVQGSPN

 

 

FBDIUPQDPSOFSBUB¡

 

 

BOHMFUPBMMPXUIFXBUFS

 

 

SFTJTUJWFCBSSJFSUPCF

 

OE

MBQQFEPWFSUIFmOBUUIF

£

IFBEPGUIFEPPS

 

DVU

 

£

Manual backgroundManual backgroundManual backgroundManual backgroundManual backgroundManual backgroundManual background&YUFSJPS

£

D. Fold the water resistive barrier (1D). Fold side flaps into the opening and staple to inside wall. Fold top flap up and temporarily fasten with flashing tape.

Page 2
Image 2
Pella 80JJ0103 installation instructions 1ROUGH OPENING PREPARATION