YOU WILL NEED TO SUPPLY:

ss#EDAREOR )MPERVIOUSOSHIMSSPACERSMTO  ss GALVANIZED ROOlNGlNAILS  LB ss D NAIL ss#LOSED CELLEFOAM BACKERLRODSEALANT BACKERN TO CFT

ss0ELLA® SmartFlashfoil backed butyl window and door

flashing tape or equivalent

 

ss(IGHGQUALITYUEXTERIOR GRADE POLYURETHANE ORNSILICONE

SEALANTL TOT TUBES PERODOOR

4&"-"/5

 

ss'REATA3TUFF Window and Door Insulating Foam Sealant by the Dow Chemical Company or equivalent low pressure polyurethane window and door foam - DO

./44USEUHIGH PRESSUREEOR LATEX FOAMS

ss0ELLA ALUMINUMLSILL SUPPORTTOR  X  WOODXBLOCKING ss)NTERIORRTRIM ANDORRJAMB EXTENSIONSO TO MFT

TOOLS REQUIRED:

ss4APEPMEASURE ss,EVEL

ss3QUARE

ss(AMMER ss3TAPLER ss3CISSORS ORSUTILITY KNIFE

ss3CREWDRIVERSR

 0HILLIPSLANDPSMALLAmATDBLADE

ss !LLEN WRENCH ss$RILL ss3EALANT GUN

REMEMBER TO USE APPROPRIATE PERSONAL PROTECTIVE EQUIPMENT.

1ROUGH OPENING PREPARATION

A.Verify the opening is plumb and level. Note: It is critical that the bottom is level.

*OUFSJPS

B.Verify the door will fit the opening. Measure all four sides of the opening to make sure it is 3/4" larger than the door in width and 1/2" larger in height. On larger openings measure the width and height in several places to ensure the header or studs are not bowed.

Note: 1-1/2" or more of solid wood blocking is required around the perimeter of the opening. Fix any problems with the rough opening before proceeding.

£

*OUFSJPS

C. Cut the water resistive barrier.

BUFS3FTJTUJWF#BSSJFS TUDVU

 

 

SEDVU

 

 

UIDVU

 

 

.BLFBDVUVQGSPN

 

 

FBDIUPQDPSOFSBUB¡

 

 

BOHMFUPBMMPXUIFXBUFS

 

 

SFTJTUJWFCBSSJFSUPCF

 

OE

MBQQFEPWFSUIFmOBUUIF

£

IFBEPGUIFEPPS

 

DVU

 

£

&YUFSJPS

£

D. Fold the water resistive barrier (1D). Fold side flaps into the opening and staple to inside wall. Fold top flap up and temporarily fasten with flashing tape.

Page 2
Image 2
Pella 80JJ0103 Rough Opening Preparation, flashing tape or equivalent, 44USEUHIGH Pressureeor Latex Foams