Pella 80JJ0103 installation instructions F. Check the interior reveal. Make sure the

Models: 80JJ0103

1 8
Download 8 pages 37.51 Kb
Page 4
Image 4
F. Check the interior reveal. Make sure the

E.Plumb and square door. Place shims at each hinge and lock strike location between the door and the sides of the opening.

)NSERTTSHIMSHIN OTHER LOCATIONS ASENEEDED STARTING UPG FROM THE bottom of the door to square it in the opening. Make sure that the

REVEALAAROUND THE DOORS ISDEQUAL /NNDOUBLE DOORS EMAKE SUREETHAT panels are even across the bottom.

Note: On center latch double doors the lock strike will not be shimmed since it is located in the center of the unit. DO NOT over shim.

Ó Manual backgroundManual backgroundManual backgroundManual background&YUFSJPS

F. Check the interior reveal. Make sure the

Ó

measurement from the interior face of the door

 

to the interior face of the wall is equal at several

 

points around the door.

 

Note: If the dimensions are not equal, check to make sure the fins are folded out to 90° at all points.

Manual background““Ó

äManual background

£

 -

 

Îä

Ó

 

 

Èä

Çä

 

 

ÎManual backgroundManual background

Manual backgroundManual backgroundManual background *OUFSJPS

' &ASTENTTHENDOOR TOEOPENINGOBYYDRIVINGI GALVANIZED ROOlNGl NAILSIINTO EACHNPREPUNCHEDNHOLE INDTHEHNAILING lN

Note: Make sure the fin corner is lying as flat as possible.

 

When using the optional fin at the sill, attach

Ó

the aluminum sill support or wood blocking

 

under the sill of the door before proceeding

 

to Step H.

 

( #AREFULLY OPENYTHEODOORS ANDHREMOVEEALLA

Ó

shipping spacers.

 

Note: Be sure to remove the spacers from the bottom edge of the door panel.

Double doors with center latch: Designer Series Only: Use the construction handle to operate the active door panel. Operate the flushbolts per the instructions on the label on the strike located on the astragal.

Architect Series Only: Use the construction handle to operate both the active and passive door panels.

Ó

Ó Manual background

Manual background&YUFSJPS

Ó

I.Out-swing doors: Place a dab of sealant in each of the pre-

DRILLEDLHOLESDIN THE BOTTOM OF THE DOOREFRAME THENOINSERTTA  X  STAINLESS STEEL SCREWWPROVIDED INTO EACH HOLE

Note: Single doors will have two pre-drilled holes, double doors will have four.

I1. Out-swing double doors only: Place a dab of sealant into the

center hole of the strike plate located at the sill of the door. )NSTALL A LX  mAT HEADXSTAINLESSmSTEEL WOOD SCREWWPROVIDED into this hole.

Note: For masonry floors, use a #8 masonry screw instead of the wood screw.

Manual backgroundManual backgroundManual background *OUFSJPS

Ó

Ó

J.On center latching (double) doors: Place shims at the top of the door frame above the center

STRIKE PLATE 3ECUREETHETSHIMS BYYINSERTING A  XA mAT HEAD STAINLESSNSTEELSSCREWWINTO THE UPPER door frame through the center hole of the strike plate and the shims into the rough opening.

J1. On center hinged double doors: Insert and attach shims directly above the astragal in the center of the unit.

+ /NNEACH HINGE STARTING ATGTHEATOP INSERTTA  LONGSCREWWPROVIDED INTO THEIOPEN SCREWWHOLEOMake sure that the screw passes through the shims and into the structural framing.

Note: This step does not apply to center hinge double doors.