YOU WILL NEED TO SUPPLY:
• Impervious Shims/Spacers (12 to 20)
• Finish nails, 1" brads
•3/16" x
•Closed cell foam backer rod/sealant backer (12 to 30 ft.)
• Pella® SmartFlash™ foil backed butyl window and door flashing tape or equivalent
• Great Stuff ™ Window and Door Insulating Foam Sealant by the Dow Chemical Company or equivalent low pressure polyurethane window and door foam - DO NOT use high pressure or latex foams.
• OSI Quad
(1 tube per window)
TOOLS REQUIRED:
•Tape measure
•Level
•Square
•Hammer or Finish Nailer
• Stapler
• Scissors or utility knife
•Drill with a #2 Phillips (at least 4" long) and #3 square drive bit (provided in cable clamp kit)
• 1/2" open end wrench
•3/16" wrench or socket
•Sealant Gun
Installation will require two or more persons for safety reasons.
LEGEND - STEPS REQUIRED OF:
ALL
REPL APPS
NEW CONST
=All applications
=Replacement applications
=New Construction applications
REMEMBER TO USE APPROPRIATE PERSONAL PROTECTIVE EQUIPMENT.
1ROUGH OPENING PREPARATION | Water Resistive Barrier | 1C | |
1st cut |
| ||
ALL | A. Remove all packaging from the window. | 3rd cut |
|
|
| ||
|
|
|
| APPS |
| B. | REPLACEMENT APPLICATIONS: Remove the |
| REPL |
|
| existing, window, trim, insulation and sealant from the |
|
|
| opening. | |
|
|
|
|
|
| CONST |
| C. NEW CONSTRUCTION APPLICATIONS: Cut the | |
| NEW |
|
| water resistive barrier. Fold the side flaps into the opening |
|
|
| and staple to inside wall. | |
|
|
|
| |
|
|
| D. Confirm the window will fit the opening. Measure all | |
| ALL |
| ||
|
|
| four sides of the opening to make sure it is 3/4" larger | |
| ALL |
|
| than the window in both width and height. Measure the |
|
|
| width and height in several places to ensure the header | |
|
|
|
| |
| ALL |
|
| and studs are not bowed. |
|
|
| Note: | |
| ALL |
|
| |
|
|
| around the perimeter of the opening. Fix any problems | |
| ALL |
|
| with the opening before proceeding. If installing new |
|
|
| blocking, install the blocking so it’s flush with the | |
|
|
|
| |
| ALL |
|
| exterior sheathing of the house. DO NOT attempt to |
|
|
| install a window in an under size opening. | |
| ALL |
|
| |
|
|
|
| |
| ALL |
| E. | Confirm the opening is plumb and level. |
|
|
| ||
| ALL |
|
| Note: It is critical the bottom is level. |
|
|
|
|
|
2nd
cut
1D