Table 1-2. Ventilation and Fire Safety References

 

 

 

 

 

Topic

 

 

 

Underwriter Laboratory Document

 

 

 

 

 

Grease Extractor

 

 

 

ANSI/UL 710-1981

Ventilation Hood

 

 

 

ANSI/UL 705-1984

Filter Unit

 

 

 

ANSI/UL 586-1985 and ANSI/UL 900-1987

 

 

 

 

 

 

Types

of

Fire Extinguishers and Detection Equipment

 

 

 

 

 

CO2

 

 

 

ANSI/UL 154-1983

Dry Chemical

 

 

 

ANSI/UL 299-1984

Water

 

 

 

ANSI/UL 626-1984

Sprinklers

 

 

 

ANSI/UL 199-1982

Smoke Detectors

 

 

 

ANSI/UL 268-1981

Fire Detection

 

 

 

 

Thermostats

 

 

 

ANSI/UL 521-1987

 

 

 

 

 

1.3.5Inspection

When the installation of the cooker is completed, it must be inspected by the local authorities.

1.4INITIAL ADJUSTMENTS

After the cooker has been installed, it needs to be adjusted to ensure that it will perform as designed. These adjustments must be performed by a qualified person. The following tools will be needed to perform these adjustments:

• Digital Thermometer (Temperature probe)

1-6

Page 14
Image 14
Pitco Frialator and RSE14, PPE14-L manual Inspection, Initial Adjustments