Polycom 6300 MCU manual Install Base Stations, Mount Base Stations on Dropped Tile Ceilings

Models: 6300 MCU

1 50
Download 50 pages 53.85 Kb
Page 37
Image 37

5

Install Base Stations

Be sure the Base Station is positioned clear of anything that might damage it. The Base Station should be well above head height, away from doors and other objects that might strike it, and away from areas open to the elements or possible water leaks.

Check the location for other radio antenna devices and place the Base Stations to avoid interference. Leave enough slack wire to account for possible future Base Station moves.

Mount Base Stations on Dropped Tile Ceilings

A ceiling clip and plastic bolt are supplied to install Base Stations on the drop ceiling rails (T-bars) used to support acoustical tile. The plastic bolt screws into the top of the Base Station, then snaps into the ceiling clip which has been attached to the rails that hold the acoustical tile. The fastener is designed for use on 15/16" wide rails.

1.Attach the metal fastener to the rail (T-bar) supporting the dropped ceiling by rotating it into position until it snaps into the locked position.

2.Screw the plastic bolt to the 1/4 x 20 captive nut into the top of the Base Station.

3.Slide the bolt into the exposed prongs of the metal clip until it snaps into position.

PN: 1725-36121-001_J.doc

37

Page 37
Image 37
Polycom 6300 MCU manual Install Base Stations, Mount Base Stations on Dropped Tile Ceilings