PORTABILITY KIT INSTALLATION
TOOLS REQUIRED: 7/16”, 1/2”, 9/16", and 5/8” sockets and ratchets, block(s) of wood (minimum of 6” tall).
Refer to the parts list on page 9.
WHEEL INSTALLATION
1.Block up end of generator opposite the fuel tank cap to install wheel kit.
2.Insert wheel spacer (item 45) into the center of the wheel
(item 31).
3.Slide 3/8 x 4.25” bolt (item 35) and 3/8 washer (item 47) through the wheel (item 31), then through the wheel bracket on the carrier, with the offset side of the wheel hub against the wheel bracket.
4.Thread 3/8 nyloc nut (item 36) onto the bolt and tighten to securely clamp the wheel assembly to the tubing.
5.Repeat above instructions for the remaining wheel.
FOOT INSTALLATION
1.Assemble the rubber feet (item 32) to the foot bracket (item 27) using a
2.Blocking up the alternator side of the generator, place the foot bracket under the carrier channel. Thread a
HANDLE INSTALLATION
1.Place handle (item 28) over carrier tubing on same end as feet, centering handle on the carrier.
2.Slide 5/16 x 2.25” bolt (item 30) through handle, handle bracket, and 5/16 washers (item 41) as shown in diagram and secure with 5/16” nyloc nut (item 4). Tighten until handle is securely clamped to the bracket.
1
4440
2
LOCKING HANDLE
1.Attach the lanyard (item 44) to the release pin (item 40) and carrier as shown in the illustration.
2.To lock the handle (item 28) in the extended position, align the holes in the handle bracket with the holes in the carrier bracket and insert the release pin (item 40).
CORD SET
Your generator is supplied with a 25 foot 12 GA SJTW
You will notice that the
|
|
|
English | 3 | |
|
|
|