EXTENDED BATTERY MODULE INSTALLATION

8.Remove the top front covers of all cabinets.

9.Install the remaining ground straps between each cabinet (see Figure 32).

Front Ground Strap

Figure 32. Front Ground Strap Installation (2-High Cabinets Shown)

10.Continue to one of the following sections:

S “Communication” on page 47 to install UPS communication options, such as X-Slot cards or Remote Emergency Power-off.

S “Operation” on page 65 to start up the UPS.

NOTE After UPS startup, ensure maximum battery runtime by configuring the UPS for the correct number of EBMs (see page 73).