INSTALLATION
EATON Powerware® 9135 Two−in−One UPS (5000/6000 VA) User’s Guide S 164201726 Rev 1
www.powerware.com
35
Installing the UPS
NOTE Do not make unauthorized changes to the UPS or accessories; otherwise, damage
may occur to your equipment and void your warranty.
See UPS Rear Panels" on page 44 for the rear panel of each model.
To install the UPS and optional EBMs:
1. If installing an optional EBM, continue to Step 2; otherwise,
continue to Step 4.
2. Verify that the EBM battery circuit breaker is OFF.
3. Plug the EBM cable into the battery connector. Plug the EBM
communication cable into the RJ−11 port. See Figure 17.
Up to four EBMs may be connected to the UPS.
EBM
Communication
Cable
EBM Cable
EBM Battery
Connectors
Battery Circuit
Breaker
Figure 17. UPS Installation with Three EBMs