INSTALLATION

Rack Setup for the EBM

C A U T I O N

The EBM is heavy [77 kg (170 lb)]. A minimum of two people are required to remove the EBM from its carton.

NOTE Mounting rails are required for each individual cabinet.

To install the EBM rail kit:

1.Loosen the assembly wing nuts on both rail assemblies and adjust the rail size for the depth of your rack (see Figure 1).

Front

Assembly Wing Nuts

Rail Assembly

Rear

Figure 1. Adjusting the Rail Depth

2.Select the proper holes in the rail for positioning the EBM and other cabinets in the rack.

Place the first rail for the first EBM at the bottom, using positions 1 and 6 for the front hex-head screws. If you are installing additional rails, place the next rail 4 holes above the last installed screw (see Figure 2).

NOTE Verify that the hole patterns on the rails and mounting brackets align with the hole pattern on the rack.

EATON Powerware® BladeUPS® EBM User's Guide S 164201650 Rev 2 www.powerware.com

15

Page 19
Image 19
Powerware none manual Rack Setup for the EBM