INSTALLATION
Rack Setup for the EBM
C A U T I O N
The EBM is heavy [77 kg (170 lb)]. A minimum of two people are required to remove the EBM from its carton.
NOTE Mounting rails are required for each individual cabinet.
To install the EBM rail kit:
1.Loosen the assembly wing nuts on both rail assemblies and adjust the rail size for the depth of your rack (see Figure 1).
Front
Assembly Wing Nuts
Rail Assembly
Rear
Figure 1. Adjusting the Rail Depth
2.Select the proper holes in the rail for positioning the EBM and other cabinets in the rack.
Place the first rail for the first EBM at the bottom, using positions 1 and 6 for the front
NOTE Verify that the hole patterns on the rails and mounting brackets align with the hole pattern on the rack.
EATON Powerware® BladeUPS® EBM User's Guide S 164201650 Rev 2 www.powerware.com | 15 |