Premier Mounts PP-FCMA-QL installation instructions Installation Instructions, Page, Pp-Fcma-Ql

Models: PP-FCMA-QL

1 12
Download 12 pages 38.96 Kb
Page 9
Image 9
Manual background

PP-FCMA-QL

Braided

Cable

Cable

Lock

EMT

Conduit

Ceiling

Tile

T-Bar

Frame

Step 1. Once the braided cables have been attached to the upper mounting structure (wood joist, concrete or ceiling truss), it is now time to attach the braided cable to the PP-FCMA-QL.

Step 2. Thread each braided cable through the Quick Lock (see previous page).

Step 3. Loop the braided cables through the space between the EMT conduit pipe and the top of the pipe clamp (see previous page). Step 4. When adjusting the tension of the weight-bearing side of the Quick Lock, the cable must be pulled through the Quick Lock until

the desired tension is attained. Once attained, pull the braided cable through the other side of the Quick Lock (see previous page).

Step 5. Once the tension has been adjusted, be sure that there is at least 6” of excess braided cable on the non-weight bearing side of the Quick Lock.

Step 6. Use cable cutters to remove any remaining braided cable (optional).

Ceiling

Tile

If you chose to use the optional EMT conduit pipe, the ceiling tiles where the EMT conduit pipe crosses over must be installed prior to installing the EMT conduit pipe.

Step 7. Reinstall the ceiling tile.

Installation Instructions

Page 9

Page 9
Image 9
Premier Mounts PP-FCMA-QL installation instructions Installation Instructions, Page, Pp-Fcma-Ql