Optional Installations
NOTE: These installation instructions apply only to installing the PDS Base Box. For complete
1.After the upper pipe has been properly secured to the ceiling structure, screw the base box to the lower portion of the
2.Make the necessary viewing adjustments (please see Page 5, Adjusting the Projector).
3.To install the escutcheon ring, open the ring, place it around the
4.When all final adjustments have been made, tighten all hardware.
PDS Base |
Box |
Projector |
Bracket |
Custom Length
of NPT Pipe
Set Screw (tighten once the desired position is locked in).
|
|
|
| Projector | |
|
|
|
|
| Figure 6 |
|
|
|
| ||
|
|
| NOTE: These installation instructions apply only to | ||
|
|
|
| installing the PDS Base Box. For complete | |
Escutcheon Ring | Ceiling Tile |
| |||
|
|
|
| the | |
|
|
| 1. Secure the 1½" (NPT) nipple to the ceiling plate and | ||
XL6000CM |
| secure the nipple or (custom length of 1½” NPT pipe) | |||
or Pipe | Ceiling Frame |
| by using one (1) M5 x 16 Phillips head screw | ||
|
|
|
| (supplied) to the stud plate (Figure 7). | |
|
|
| 2. Thread the base box to the pipe, or nipple, and secure | ||
|
|
|
| with the M6 x 8mm set screw. | |
Projector | Set Screw (tighten once |
| 3. | To install the escutcheon ring, open the ring, place it | |
|
| around the | pipe, and close. The escutcheon ring must | ||
Bracket | the desired position is |
|
| ||
| locked in). |
|
| then be fitted into place. | |
|
|
| 4. When all final adjustments have been made, tighten all | ||
| Figure 7 |
|
| hardware. |
|
|
|
|
|
| |
|
|
| CAUTION: | The set screw must be used to stabilize | |
|
|
|
|
| the 1½" (NPT) nipple or optional pipe. |
Page 6 | Installation Instructions |